Turbocharger Technology
Turbo Installation Guide
Simple steps to ensure a hassle free installation
1. Check and ensure that the following are clean and free from obstruction, replace if necessary.
- Engine intake/exhaust
- Intercooler systems
- Oil inlet
- Oil drain flanges
- Exhaust mounting flange and studs
2. Replace with recommended oil and filter.
3. Fill the turbocharger oil feed hole with clean engine oil and slowly rotates the rotor by hand.
4. Mount the turbocharger on the exhaust flange and ensure that the turbine inlet gasket fits correctly to give a gas tight seal.
5. Connect the oil drain pipe and all external fittings to the turbocharger.
6. Pull out the fuel stop and crank engine to develop oil pressure.
7. Start the engine and idle check that all air, gas and oil connections are tight and free from leakage. Tighten any fastenings as appropriate, using soapy water to help detect gas leaks.